Download List

Project Description

PMbyAS is an Italian Web-based management system
for time and money spent on resources on a day by
day basis. It can reports on jobs that are
currently in progress as well as jobs that fall
between given dates. A single job can refer to a
customer order, an inner or external project, or
any other activity of the company.

System Requirements

System requirement is not defined
Information regarding Project Releases and Project Resources. Note that the information here is a quote from Freecode.com page, and the downloads themselves may not be hosted on OSDN.

2010-09-14 07:52
4.5

This release adds support for billing. Any activity or expenditure may be billable. The system displays the billable activity, which can be included or excluded in a CSV file for the transfer of information to invoice printing functions (external PMbyAS).

2009-05-03 15:59
4.0

The setting of access rights was renewed according to a functional logic. The main menu was reorganized, which now shows only the functions which you have the right to access. A complete system is included for managing the card and the time stamp, automatically (at login) and manually. A filter system is included to associate certain programs and activities to resources. Automatic calculation of the reimbursement per kilometer was added. A ticket restaurant is included in cash management. The ability to change a password at login was added.

2007-02-15 02:55
3.1a

This release adds a link to the online manual in the "help generale" menu.
Tags: Minor feature enhancements

2007-02-05 22:28
3.1

It is possible to know the exact number of resources in a distinct day, in the past or in the future.
Tags: Minor feature enhancements

2007-01-24 15:20
3.0

The main new feature is management planning, which
involves general organization, planning of the
voices of management, and planning of the standard
resources. All the resources (such as human,
material, assets, and services) are now managed in
a uniform way. and preview given fixed and
variable data. The procedures of forecast and
synthesis have been revised. Some tables were
replaced.
Tags: Major feature enhancements

Project Resources